Offshore Wind · Dogger Bank
320 MWCapacity
350,000Homes powered
28 mWater depth
2027Commissioned
Shallow-water fixed foundations on the Dogger Bank, consented and heading into build in 2027.
Shallow-water fixed foundations on the Dogger Bank, consented and heading into build in 2027.